DevOps sounds cool like some covert special operations IT combat team, but it is missing the boat in many implementations because it only focuses on the relationship between Dev and Ops and is usually only championed by Ops. The name alienates important contributors on the software delivery team. The team is responsible for software delivery including analysis, design, development, build, test, deploy, monitoring, and support. The entire team needs to be included in DevOps and needs visibility in to delivery pipelines from end-to-end. This is an unrelated rant, but this lead me to thinking about how a delivery team can monitor changes in delivery pipelines.

Monitor Change

I believe it is important that the entire team be able to monitor changes as they flow through delivery pipelines.. There are ticket management systems that help capture some of the various stages that a change goes through, but its mostly various project management related workflow stages and they have to be changed manually. I’d like a way to automatically monitor a change as if flows from change request all the way to production and monitor actions that take place outside of the ticket or project management system.

Normally, change is captured in some type of ticket maybe in a project management system or bug database (e.g. Jira, Bugzilla). We should be able to track various activities that take place as tickets make their way to production. We need a way trace various actions on a change request back to the change request ticket. I’d like a system where activities involved in getting a ticket to production automatically generate events that are related to ticket numbers and stored in a central repository.

If a ticket is created in Jira, a ticket created event is created. A developer logs time on a ticket, a time logged activity event is created that links back to the time log or maybe holds data from the time log for the ticket number.

When an automated build that includes the ticket happens, then a build stated activity event is created with the build data is triggered. As various jobs and tasks happen in the automated build a build changed activity event is triggered with log data for the activity. When the build completes a build finished activity event is triggered. There may be more than one ticket involved in a build so there would be multiple events with similar data captured, but hopefully changes are small and constrained to one or a few tickets… that’s the goal right, small batches failing fast and early.

We may want to capture the build events and include every ticket involved instead of relating the event directly to the ticket, not sure; I am brainstorming here. The point is I want full traceability across my software delivery pipelines from change request to production and I’d like these events stored in a distributed event store that I can project reports from. Does this already exists? Who knows, but I felt like thinking about it a little before I search for it.

Ticket Events

  1. Ticket Created Event
  2. Ticket Activity Event
  3. Ticket Completed Event

A ticket event will always include the ticket number and a date time stamp for the event, think Event Sourcing. Ticket created occurs after the ticket is created in the ticket system. Ticket completed occurs once the ticket is closed in the ticket system. The ticket activities are captured based on the activities that are configured in the event system.

Ticket Activity Events

A ticket activity is an action that occurs on a change request ticket as it makes its way to production. Ticket activities will have an event for started, changed, and finished. Ticket activity events can include relevant data associated with the event for the particular type of activity. There may be other statuses included in each of these ticket activity events. For example a finish event could include a status of error or failed to indicate that the activity finished but it had an error or failed.

  • {Ticket Activity} Started
  • {Ticket Activity} Changed
  • {Ticket Activity} Finished

Deploy Started that has deploy log, Build Finished that has the build log, Test Changed that has new test results from an ongoing test run.

Maybe this is overkill? Maybe this should be simplified where we only need one activity event per activity and it includes data for started, changed, finished, and other statuses like error and fail. I guess it depends on if we want to stream activity event statuses or ship them in bulk when an activity completes; again I’m brainstorming.

Activities

Every ticket won’t have ticket activity events triggered for every activity that the system can capture. Tickets may not include every event that can occur on a ticket. Activity events are triggered on a ticket when the ticket matches the scope of the activity. Scope is determined by the delivery team.

Below are some of the types of activity events that I could see modeling for events on my project, but there can be different types depending on the team. So, ticket activity events have to be configurable. Every team has to be able to add and remove the types of ticket activity events they want to capture.

  1. Analysis
    1. Business Analysis
    2. Design Analysis
      1. User Experience
      2. Architecture
    3. Technical Analysis
      1. Development
      2. DBA
      3. Build
      4. Infrastructure
    4. Risk Analysis
      1. Quality
      2. Security
      3. Legal
  2. Design
  3. Development
  4. Build
  5. Test
    1. Unit
    2. Integration
    3. End-to-end
    4. Performance
    5. Scalability
    6. Load
    7. Stress
  6. Deploy
  7. Monitor
  8. Maintain

Reporting and Dashboards

Once we have the events captured we can make various projections to create reports and dashboards to monitor and analyze our delivery pipelines. With the ticket event data we can also create reports at other scopes. Say we want to report on a particular sprint or project. With the ticket Id we should be able to gather this and relate other tickets in the same project or sprint. It would take some though as to whether we would want to capture project and sprint in the event data or leave this until the time when we make the actual projection, but with ticket Id we can expand our scope of understanding and traceability.

Conclusion

The main goal with this exploration into my thoughts on a possible application is to explore a way to monitor change as it flows through our delivery pipelines. We need a system that can capture the raw data for ticket create and completed events and all of the configured ticket activity events that occur in between. As I look for this app, I can refer to this to see if it meets what I envisioned or if there may be a need for this.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s